project

PEPCO Substation

This project consists of a 230,000 volt electrical utility substation, a new PEPCO Waterfront Substation.  The substation is located between the Nationals Stadium and the new DC United Stadium. This project occupies an entire city block in Southwest DC.

Project Info

The photo illustrates state of the art, American Brown Boveri (ABB) Gas Insulated Switchgear (GIS) that will be located within the facility including transformers, reactors, capacitors and phase shifters.

 

Project Details

Location: Washington, DC

Category: Specialty

 

Let's Build Something

We'd love to talk to you about your next project. Let's get in touch today and start your dream project.